Insurance
Structural Design
Following a piling collapse in an adjacent development we were appointed by the Insurance Loss Adjuster to monitor and agree the remedial work design.
![](https://41p9c2.n3cdn1.secureserver.net/wp-content/uploads/2022/02/Wimbledon-High-Street-2.jpg?time=1722037889)
Wimbledon High Street
An investment client instructed us to survey a mixed commercial and residential asset on Wimbledon High Street, containing three 2 storey retail units and 3